Description
Installation height 1.13 and 1.30 m
for manual activation or using the Tectron 6V or 230V infrared system
for wall mounting or mounting in a skeleton wall
steel frame, powder coated, self-supporting, for drywall
complete pre-assembly, object connections with adjustable height, with quick adjustment and height locking
fixing material
drain bend DN 50
fixing bolts M8, with ceramic fixing
connection for inlet and inlet kit
water unit with stop valve
flow pressure min 0.5 bar
operating pressure max. 10 bar
flushing aid kit
work piece checked at the factory
water connections 1/2" with external thread
230 V power connection box
mounting box with gasket
inspection chimney for ready-to-install kits 116 x 144 mm
Rapid SL 38 558 00M wall angles required for installation (ordered separately)